CASE STUDIES
A selection of historic GED projects, covering a varierty of sites and various heat pump technologies.
Filter Projects
Hudson Square, 555 Greenwich Street
RIBA Stages 4 & 5 Technical Design of 555 Greenwich Street, Manhattan, New York, USA. Completed in 2022, the 16-storey all-electric office building incorporates a hybrid GSHP and ASHP system with 63 geothermal energy piles to deliver low-carbon heating and cooling
Bulgari Hotel
RIBA Stage 4 Technical Design of the Bulgari Hotel, London, UK. Completed in 2012, the ten-storey luxury hotel incorporates a Ground Source Heat Pump system with energy piles and energy walls to provide renewable heating and cooling.
Splashpoint Leisure Centre
RIBA 4, Technical Design of Splashpoint Leisure Centre, Worthing UK. It was constructed in 2014 and contains three heated indoor swimming pools.
Wythenshawe Forum
RIBA 4, detailed design of Wythenshawe Forum in Manchester U.K. The Forum Centre is a community and business hub with integrated public services such as a leisure centre. A heating and cooling system, utilising ASHP and WSHP technologies.
Woodend Hospital - NHS Grampian
Hybrid ASHP and GSHP design with shared ground loop array. RIBA 3 design.
Manor House - Domestic
System design for a GSHP system integrated with a PV array in a Grade II listed domestic property.
Hinksey Pool
WSHP system, extracting from Hinskey Lake and serving the outdoor pools. RIBA 4.
Dorchester Primary School (HCAT)
Installation of a low carbon heat source and supplementary PV array.
Cameron Hospital - NHS Fife
RIBA 3 detailed design of heat pump system with ground loops and ‘de-steaming’ of entire site.
Domestic Pool House
Concept and specification of a combined GSHP and Solar PV-T system. RIBA 3.
Borders General Hospital - NHS Borders
Detailed design of a shared ground source heat pump system and ‘de-steaming’ of satellite buildings. RIBA 3.