Bulgari Hotel

RIBA Stage 4 design of a GSHP system for simultaneous heating and cooling.


LOCATION

London, UK


DESIGNED TECHNOLOGY

140 kW Heating

140 kW Cooling

GSHP

RIBA 4 Technical Design

49 Energy Piles (18 m average active depth)

54 Energy Wall Panels (33 m active depth)


PROJECT OVERVIEW

The Bulgari Hotel project is a 10-storey luxury hotel in London with a six-level basement. GeoEnergy Design delivered the RIBA Stage 4 technical design for the ground source heat pump (GSHP) system that integrates geothermal energy piles and energy walls to provide efficient, low-carbon heating and cooling.

PROJECT DELIVERABLES

GeoEnergy Design delivered the RIBA Stage 4 technical design for the ground source heat pump system, including the design of the heating and cooling plant, integration of geothermal energy piles and energy walls, and support for thermal conductivity testing. The project also included system performance monitoring and optimisation strategies, delivering a renewable energy solution that met planning requirements while improving overall efficiency and reducing carbon emissions.

Geothermal Piping within Piles

Previous
Previous

Hudson Square, 555 Greenwich Street

Next
Next

Splashpoint Leisure Centre