PROJECT OVERVIEW

Decarbonisation of outdoor community swimming pool heated between April and October, located in Hinksey Park, Oxford. GeoEnergy Design was commissioned by Oxford City Council to do a stage 2 feasibility, followed by detailed stage 4 design for construction, following successful Public Sector Decarbonisation Scheme funding.

  • Design Peak Heating Load 580kW ( 4 x ecoForest HP 25-100) Water source heat pumps

  • 16,500m of 32mm of heat collector pipe in the lake (75 x slinkies)

  • Seasonal COP 5.20

Heat collector pipe install (slinkies)

Heat collector pipe install.

Post installation

Site plant room