Hinskey Pool
LOCATION
Oxford, UK
DESIGNED TECHNOLOGY
580kW WSHP
PROJECT OVERVIEW
Decarbonisation of outdoor community swimming pool heated between April and October, located in Hinksey Park, Oxford. GeoEnergy Design was commissioned by Oxford City Council to do a stage 2 feasibility, followed by detailed stage 4 design for construction, following successful Public Sector Decarbonisation Scheme funding.
Design Peak Heating Load 580kW ( 4 x ecoForest HP 25-100) Water source heat pumps
16,500m of 32mm of heat collector pipe in the lake (75 x slinkies)
Seasonal COP 5.20
Heat collector pipe install (slinkies)
Heat collector pipe install.
Post installation
Site plant room