CASE STUDIES
A selection of historic GED projects, covering a varierty of sites and various heat pump technologies.
Filter Projects
Bulgari Hotel
RIBA Stage 4 Technical Design of the Bulgari Hotel, London, UK. Completed in 2012, the ten-storey luxury hotel incorporates a Ground Source Heat Pump system with energy piles and energy walls to provide renewable heating and cooling.
Splashpoint Leisure Centre
RIBA 4, Technical Design of Splashpoint Leisure Centre, Worthing UK. It was constructed in 2014 and contains three heated indoor swimming pools.
Wythenshawe Forum
RIBA 4, detailed design of Wythenshawe Forum in Manchester U.K. The Forum Centre is a community and business hub with integrated public services such as a leisure centre. A heating and cooling system, utilising ASHP and WSHP technologies.