CASE STUDIES
A selection of historic GED projects, covering a varierty of sites and various heat pump technologies.
Filter Projects
Hudson Square, 555 Greenwich Street
RIBA Stages 4 & 5 Technical Design of 555 Greenwich Street, Manhattan, New York, USA. Completed in 2022, the 16-storey all-electric office building incorporates a hybrid GSHP and ASHP system with 63 geothermal energy piles to deliver low-carbon heating and cooling.
Bulgari Hotel
RIBA Stage 4 Technical Design of the Bulgari Hotel, London, UK. Completed in 2012, the ten-storey luxury hotel incorporates a Ground Source Heat Pump system with energy piles and energy walls to provide renewable heating and cooling.
Splashpoint Leisure Centre
RIBA 4, Technical Design of Splashpoint Leisure Centre, Worthing UK. It was constructed in 2014 and contains three heated indoor swimming pools.